I can offer no opinions, but would like to ask a question, I have a Reese load leveling hitch with 600 lb. bars. I went over a bridge with a pretty good change in elevation. The chain stripped the "U" bolt out of the bar. Since that happened, I don't pre-load the bars quite as much. My question is, what is the proper pre-load?