I'm here in Washington State. Haven't done anything with my Chandler project this year, but then the year isn't over either!
Unfortunately, I won't be attending Hershey this year so I won't make the annual meeting. I look forward to hearing about all the fabulous Chandler finds.
I also wondered about the newsletter. When can we expect another issue? Anyone????
Hi Youall'
I'm still here ,Down South Carolina. I'm almost threw with the add on on my garage. Can't wait to get back to working on my Chandler!!! At least I'll have room to do it.If I can just rember how?
I hope everyone has a good time in Hershey. Hope to be at it next year.
Roger.
__________________ Roger & Shelia Chandler
Greenville, SC
1929 Chandler Royal 8 Deluxe
__________________ 1931 Dodge Brothers DH6 business coupe w/ wire wheels
1931 Dodge Brothers DH6 business coupe w/ wood wheels (my 1st car and still have it)
1967 Dodge A100 compact pickup
and visions of my past old cars
I am still here. No progress on our Chandler either. And I too am waiting to see a new newsletter. I heard from another member this week that he just got his first one since I retired. Anxious to read my copy.
Mena sounds like a great find. Please keep us posted. We love to see pictures.
Chris
__________________ Chris & Jill Gorman
1929 Chandler 65
1928 Chandler parts car
1968 Mustang
1966 MGB Roadster
Cylinder Repair: One cylinder is cracked. 3 or 4 pins and sealer.
Seal second cylinder assy.
Includes : Shot Blast, Acid Dip, Repair crack
pressure seal cyl. assy. 350.00 pr. All Labor above Included in the $350.00 Valve Service : Install guide liners , Ex. seats ?? (2.5 hr.$187.50)
Replace 6 ex. Valves (Stem Damage) Rust and Lack of Oil caused the damage, Mainly Rust. $75.00 hr.
The lace w:st="on">Camlace> appears to be OK, It has very unusual lobes.
Broken bolts are No Problem. Repairs are $10 t0 $20 ea.
The Timing Chain is One of THREE chains. Judging by the gear wear
the chain should be in Cylinder work : Hone 6 cylinders, Clean Parts (Valves, Springs
Lifters, Sheet metal covers (4) 2.0 hrs. $150.00)
2 Sheet metal covers are water jackets, Fiberglass
would be the easiest repair. (2.0 hrs. $150.00)
Pistons : Clean and Glass Bead (.5 hr.$37.50) Overall, the pistons are in good condition, One piston has some taper at the
skirt end, .002. I might be able to put some "Knurl" on the piston. This piston
may have over heated, or been stuck (rusted) to the cylinder.
The pistons appear to be .010 over. The bore is @ 3.510 and the pistons are
@ 3.508. Depending on which piston is in which cylinder there is .002 to .003.
If you like I can check the whole rotating assembly for balance. @ $150.00
Piston Rings : 3.500 bore 3/16" rings(All) Size wise the cylinders look pretty good, But honing will really tell the story.
There may be some vertical scratches in the cylinders. Rods : ReBabbitt - 1) Direct babbitt (like a Model A Ford)
2) Fabricate Molds and Pour Solid Babbitt*
3) Fabricate Bearing Shells and Babbitt*
Direct Babbitt rods @ 100.00 ea. + Materials
I would direct babbitt the rods due to the lower cost! I made the suggestion of direct babbitt because you do not have a full set
of bearing shells. You have 3 solid Babbitt and 3 brass backed. The solid
babbitt will melt to nothing. Only the brass backed can be reused. So new
shells would need to be fabricated, at the same cost as the mains. So direct Babbitt is half the cost. The Babbitt is bonded to the rod, this eliminates
the need to fabricate the shells and the complex fitting procedures. Pin Bushings are good. Several rod nuts are bad, Get a Set. If you have a source to get the rod nuts then you should get them. Block Clean : Spray Cab and wire brush, R+R Cam Bearings. Spray cab, is the type of machine used to clean your engine block.
We also have tanks for cast iron and steel.
External paint, you should get. The company will buy a lower quality.
The Internal paint, I have a case of red electrical coating. If you
have ever seen the inside of an engine painted "brick red". This is it. Main Bearings : ReBabbitt
1) Fabricate Molds and Pour Solid Babbitt*
2) Fabricate Bearing Shells and Babbitt*
*Fabrication for Molds or Shells @ 200.00 ea. + Materials I would prefer brass backed bearing shells, they are stronger. However,
finding the brass stock can be time consuming. This is usually brass pipe,
Large bushings, or solid stock from a reclaimer. (used or scrap) Align bore @ 400.00
Bearing Total Cost is @ 1600.00
Gaskets : Fabricate unavailable gaskets. (Time Only.)
Lots of Small Parts Cleaning and Detail.
Water Pump Repairs : Drill/Tap for set Screw Repair Outlet Nipple.
Grind Crankshaft .010 / .010 You will have to contact Linda for a Total Cost, I have no control over pricing.
Keep in mind that there is no way to be exact about pricing, It will vary more or less due to the circumstances encountered. As well as changes that you might want.